Luxury Garden Furnishings Shop Now Open - www.duraliving.com

John Henry Group Appointed as our Registered National Installer

John Henry Group
www.johnhenrygroup.co.uk

 

Photos show severely damaged concrete and steel trench and gully covers in need of replacement to meet Health and Safety regulations.

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 

Duct Covers, Gully Covers, Structural Flooring & Trench Covers

 


Airport chequered safety zone

 


Serviceable residential walkway

 


Dura Slab allows easy maintenance access

 


Curved walkway with anti-tamper fixings

 


Gritted surface anti-slip walkway

 


Service duct covers double as heavy duty
attractive multi-purpose walkways

 


Dura Slab also suits stair case treads

GRP Mezzanine Floor

Building a Mezzanine Floor System in 5 days using Composite Technology


GRP Mezzanine Floor Before

Before


  • Far Left of new Warehouse storage facility
  • Warehouse being cleared in preparation for
    new mezzanine storage area


GRP Mezzanine Floor Before

Before




GRP Mezzanine Floor Before

Before


  • Far right of proposed new storage facility


Day 1&2 – Erecting Structure

Day 1&2 – Erecting Structure




Day 1&2 – Erecting Structure

Day 1&2 – Erecting Structure


  • Image to show stainless steel heavy duty fixings
    to join column and beam


Day 1&2 – Erecting Structure


  • Main cross beam measures 11 metres with
    column supports at 2.2m in height
  • Spans set at 3m intervals to suit load
    requirements


GRP Mezzanine Floor Day 3

Day 3


  • Dura Slab Type 40 ready to lift into position to
    create rapid install mezzanine anti-slip flooring


GRP Mezzanine Floor Day 3

Day 3


  • Mesh flooring on right side is Dura Tread 38mm anti slip grating selected to allow more
    light on right side of mezzanine storage area


GRP Mezzanine Floor Day 3

Day 3


  • Flooring on left is Dura Slab Type 40 being slotted together and fixed into position
  • Each panel measures 3.66m in length,
    supported at 1.83m


GRP Mezzanine Floor Day 4

Day 4


  • Completed mezzanine anti-slip deck area


GRP Mezzanine Floor Day 4

Day 4




GRP Mezzanine Floor Day 4

Day 4


  • Handrailing now in position created using fibreglass omega, box and tubular sections


Day 5 - Health & Safety Checks

Day 5 - Health & Safety Checks


  • Far Left of new Warehouse storage facility
  • Warehouse being cleared in preparation for
    new mezzanine storage area


Day 5 - Health & Safety Checks

Day 5 - Health & Safety Checks




Day 5 - Health & Safety Checks

Day 5 - Health & Safety Checks


  • Far right of proposed new storage facility


Day 5 - Complete

Day 5 - Complete


  • Handrailing now in position created using fibreglass omega, box and tubular sections
  • Mid rail section now sprayed hi visibility yellow
    for maximum safety
  • Additional handrail supports added on right
    hand side for extra safe storage


Day 5 - Complete


  • Stair handrail added for maximum safety


Day 5 - Complete

Day 5 - Complete


  • Caution sign added in area where top rail and
    mid rail can be removed


Day 6 - In Operation


  • Fork Lift truck being used to off-load new stock
    items safely
  • This system protects staff from unnecessary
    manual handling and promotes safe handling of
    bulky and heavy items


Day 6 - In Operation

Day 6 - In Operation


  • Mezzanine storage area provides anti-slip
    surface for maximum safety no matter the
    temperature or conditions


Day 6 - In Operation

Day 6 - In Operation


  • This particular Mezzanine storage area has
    a capacity of 10 kN / m2 (calculated @ ½%
    deflection)